Project Details
Construction Type:
New Buildings and Expansion
Area:
46,500 SF
Year:
2016
Team
M & E MEP Eng.
Hands Engineering Structural Eng.
Design Enginuity Civil Eng.
Kirkegaard Associates Acoustics
Schuler Shook Lighting Design
Harris & Harris Owners Rep.
Bradburry Stamm Constr. gen. Contr.
MAD recently completed Phase Two of the “Setting the Stage” campaign by expanding all the structures on the North side of the Crosby Theater. By carefully considering the existing landscape, MAD designed the new buildings to sensitively expand the facility while retaining important vistas and Theater sightlines.The Poole Production Center was increased by 25,000 SF to 38,000 SF while creating new outdoor plaza spaces for Opera guests to gather pre-performance and during intermission. The production center includes multiple fabrication shops with complex state of the art mechanical systems, and greatly improved stage wing level spaces for backstage activities. The new three story Wyncote Opera Club was designed to provide 8,500 SF of open lounge spaces and concessions, while introducing an elevator and bridge access to the Theater’s balcony.
Similar Projects
Burke Center for Japanese Art
Columbia University
Burke Center for Japanese Art
Columbia University
Museum Of American War Letters
Virtual architecture
Museum Of American War Letters
Virtual architecture
University Place Lecture Hall
New York University
University Place Lecture Hall
New York University
Windreich Dept Of Artificial Intelligence And Human Health
Icahn School Of Medicine At Mount Sinai
Windreich Dept Of Artificial Intelligence And Human Health
Icahn School Of Medicine At Mount Sinai